Half way through the ducting install…


This slideshow requires JavaScript.

About Lazy Larry

Just a woodworker sharing some of the things learnt the hard way... so you don't make the same mistakes...
This entry was posted in Uncategorized. Bookmark the permalink.

3 Responses to Half way through the ducting install…

  1. Michael Wurm says:

    Looking good Larry. I like the all clear runs, that’s going to help find clogs, heaven forbid. That whole thing should run super good. A super sucker!!

  2. It’s coming together very well, Larry. I only wish my extraction system was as well laid out! 🙂

  3. Bill Aplin says:

    Love the clear runs. Do you intend to earth it? What size is the drum the cyclone sits on? Looks like you are having fun, can’t wait to ssee it in action!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s